Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 23 results ...

Abdel-Razek, R H (1997) How Construction Managers Would Like Their Performance to Be Evaluated. Journal of Construction Engineering and Management, 123(03), 208–13.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(208)
  • Abstract:
    Communication of the expectations of the construction organization and those of the construction managers is a key management function for motivating and developing professional construction managers. This paper explains how the successful design and implementation of an effective performance appraisal system will improve construction managers' performance. It also explains the details of a study that was carried out in one of the largest contracting companies in the Middle East to determine and quantify the performance criteria by which construction managers would like their performance to be measured. One hundred ten construction managers participated in the study. They generated 52 ideas for performance measures. These were combined together to form 12 measures. For example, the first measure is the level of effectiveness, and this was given as 15% of the overall performance. The 12 measures were further analyzed and categorized into five areas that were considered by the project managers to be the most determining areas in which they would like their performance to be measured. For example, measurement of efficiency represented over 35% of the preferred performance measures.

Arditi, D, Khisty, C J and Yasamis, F (1997) Incentive/Disincentive Provisions in Highway Contracts. Journal of Construction Engineering and Management, 123(03), 302–7.

Bernold, L E, Lorenc, S J and Luces, E (1997) Intelligent Technology for Truck Crane Accident Prevention. Journal of Construction Engineering and Management, 123(03), 276–84.

Carr, R I (1997) Engineering and Construction Management: Leadership and Opportunity. Journal of Construction Engineering and Management, 123(03), 292–6.

Chua, D K H, Kog, Y C, Loh, P K and Jaselskis, E J (1997) Model for Construction Budget Performance—Neural Network Approach. Journal of Construction Engineering and Management, 123(03), 214–22.

Dzeng, R and Tommelein, I D (1997) Boiler Erection Scheduling Using Product Models and Case-Based Reasoning. Journal of Construction Engineering and Management, 123(03), 338–47.

El-Bibany, H (1997) Parametric Constraint Management in Planning and Scheduling: Computational Basis. Journal of Construction Engineering and Management, 123(03), 348–53.

Eldin, N N (1997) Concurrent Engineering: A Schedule Reduction Tool. Journal of Construction Engineering and Management, 123(03), 354–62.

Everett, J G and Yang, I (1997) Workers' Comp. Premiums: Disparities in Penalties for Identical Losses. Journal of Construction Engineering and Management, 123(03), 312–7.

Fischer, M and Tatum, C B (1997) Characteristics of Design-Relevant Constructability Knowledge. Journal of Construction Engineering and Management, 123(03), 253–60.

Hampson, K and Fischer, M (1997) Structural Designs and Construction Technologies for California Highway Bridges. Journal of Construction Engineering and Management, 123(03), 269–75.

Hancher, D E, Garza, J M d l and Eckert, G K (1997) Improving Workers' Compensation Management in Construction. Journal of Construction Engineering and Management, 123(03), 285–91.

Hassanein, A and Melin, J (1997) Crew Design Methodology for Construction Contractors. Journal of Construction Engineering and Management, 123(03), 203–7.

Huang, X and Bernold, L E (1997) CAD-Integrated Excavation and Pipe Laying. Journal of Construction Engineering and Management, 123(03), 318–23.

Ibbs, C W (1997) Quantitative Impacts of Project Change: Size Issues. Journal of Construction Engineering and Management, 123(03), 308–11.

Karshenas, S (1997) Strength Variability of Conventional Slab Formwork Systems. Journal of Construction Engineering and Management, 123(03), 324–30.

Li, H and Love, P (1997) Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization. Journal of Construction Engineering and Management, 123(03), 233–7.

Naresh, A L and Jahren, C T (1997) Communications and Tracking for Construction Vehicles. Journal of Construction Engineering and Management, 123(03), 261–8.

Owers, R and Weber, S L (1997) Strategic Plan for Southwest Indian Community's Construction Business. Journal of Construction Engineering and Management, 123(03), 331–7.

Price, A D F and Shawa, H (1997) Survey of Project Related Finance in United Arab Emirates. Journal of Construction Engineering and Management, 123(03), 223–32.

Puddicombe, M S (1997) Designers and Contractors: Impediments to Integration. Journal of Construction Engineering and Management, 123(03), 245–52.

Scott, S (1997) Delay Claims in U.K. Contracts. Journal of Construction Engineering and Management, 123(03), 238–44.

Touran, A and Suphot, L (1997) Rank Correlations In Simulating Construction Costs. Journal of Construction Engineering and Management, 123(03), 297–301.